How much do internal meetings cost?

Multiply the length of the meeting by the number of attendees and the company’s cost per person-hour. A 30-minute meeting with six attendees takes three person-hours. At €50 per hour, that is €150 worth of team time.

Measure a typical week

List your internal meetings and record their actual duration and attendance. Calculate the person-hours for each meeting, then add them up. The averages below work for meetings of similar sizes. If you mix short two-person check-ins with long department meetings, calculate each group separately because meeting length and attendance can vary together.

Ask your finance team for the average hourly cost of employing someone on your team. If costs vary substantially by role, add the hourly costs of the actual attendees and multiply by the meeting length in hours.

Example with four weekly meetings

Time spent today
4 meetings × 30 minutes × 6 attendees = 12 person-hours per week.
Net hours recovered
12 hours in meetings − 4 hours of reading, writing and making decisions = 8 person-hours per week.
Value of the time freed up
8 hours × €50 = €400 per week. If the savings hold, the value reaches the €9,600 pilot price in 24 weeks.

Use the estimate to decide how to redeploy the time. During the pilot, record the time actually spent coordinating in writing, any meetings still held and how many decisions were made on time. Measure net time recovered by subtracting both forms of coordination from the original time spent.

Calculate your team’s hours